Installation sequence
Power supply
(cont.)
[{A
[{S
DE
DE
1 2
1 2
3 4
B
C
Fig. 40
EA1 extension
A
Connection to controller and sensor PCB
B
Floating N/O contact 1: The agreement of the
C
power supply utility may be required
Note
■
If Smart Grid is enabled ("Enable Smart Grid 7E80"
set to "1"), both inputs DE2 and DE3 cannot be
used for signals "External demand" or "External
blocking".
The power-OFF function is integral to Smart Grid.
■
Therefore do not connect the power-OFF signal to
terminals X3.6 and X3.7. Do not remove jumper.
Closing the heat pump
!
Please note
Leaking hydraulic connections lead to appliance
damage.
Check the internal and on-site hydraulic con-
■
nections for leaks.
■
In the event of leaks, switch OFF the appli-
ance immediately. Drain off liquid via the drain
valve. Check the seating of seal rings. Always
replace displaced seal rings.
46
A
[{D
[{{]
0-10V
DE
5 6
+ -
D
f-]
A
N
L1
E
Floating N/O contact 2: The agreement of the
D
power supply utility may be required
Power supply 1/N/PE 230 V/50 Hz
E