Installation Check; Device Installation; Cables Installation - Zte MC7010 Quick Start Manual

Hide thumbs Also See for MC7010:
Table of Contents

Advertisement

Installation Check

Device Installation:

The MC7010 is installed firmly.
The network cables are installed firmly.
The cover plate on the device is installed.
The nano-SIM card is installed.
The network interface on the POE adapter is installed correctly.

Cables Installation:

Verify that all cables are connected properly, cable connectors are secure.
Cables should be laid in a clear and straight manner without crossing each
other. There is no obvious curve or slant. Cables do not hang in the air or cross
each other.