Dismounting The Hp Mcs From The Shipping Pallet; Installation Service; Spares Kits; Additional Tools And Equipment - HP MCS Manual

Modular cooling system
Table of Contents

Advertisement

Dismounting the HP MCS from the shipping pallet

To dismount the HP MCS, reverse the process for assembling the shock pallet. Figure 12 illustrates the
dismounting process for the HP MCS.
HP MCS
Figure 12.
dismounting steps

Installation service

In the United States, HP can arrange to have your HP MCS installed by qualified service providers.
This installation service covers the entire hardware installation sequence, from unpacking the
components to routing cabling and running a test of the system. Installation can also be provided
directly by HP authorized service providers.
If you need a pre-certified solution, contact the high performance technical computing (hptc) solutions
group at http://h71028.www7.hp.com/enterprise/cache/284965-0-0-225-121.html.

Spares kits

Contact your local reseller for information on spares kits.

Additional tools and equipment

• 11/16-in (or 17-mm) open-end wrench
• 9/16-in (or 14-mm) open-end wrench or socket
• 7/16-in (or 11-mm) open-end wrench or socket
• 8/16-in (or 12mm) open-ended wrench or socket
• Stretch wrap
• Banding
• HP MCS hex water connection wrench
21

Advertisement

Table of Contents
loading

Table of Contents