Kohler CABERNET WATER-GUARD K-3401 Installation Instructions Manual page 3

Vitreous china siphon vortex toilet
Table of Contents

Advertisement

Remove the old gasket from the floor and the closet flange
with a putty knife. Remove the old T-bolts and discard
them.
NOTICE: If the new toilet is not installed immediately,
temporarily stuff a rag into the closet flange.
Install two new 5/16" diameter T-bolts into the closet
flange.
TO INSTALL SUPPLY SHUT-OFF VALVE
Install the supply shut-off valve so it is 2-5/8" above the
finished floor line, and 5-3/8" to the left of the closet flange
centerline.
The centerline of the supply shut-off valve outlet should
extend 4" from the finished wall. Install the supply shut-off
valve with the outlet vertical.
TO INSTALL TOILET
Set the toilet upside down on some padding. Firmly press
the toilet gasket onto the toilet outlet.
NOTE: If you are using a toilet gasket with an integral
plastic sleeve, make sure the gasket is positioned with the
sleeve facing away from the toilet.
If you temporarily plugged the closet flange with a rag,
remove the rag at this time.
Carefully align and lower the toilet over the closet flange
and T-bolts. Apply full body weight to the toilet rim to set
the seal.
CAUTION: Risk of concealed leakage. Do not lift
or rock the toilet after placement – a new toilet
gasket must be installed if you break the watertight
seal.
AA
112037-2-
(A)
T-Bolts
2-5/8"
12"
Gasket
3
Closet Flange
Fig. #2
Closet Flange
Fig. #3
Supply Shut-Off
Valve
5-3/8"
Closet Flange
Centerline
Fig. #4
Toilet Outlet
Fig. #5
Kohler Co., Kohler, WI

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cabernet water-guard k-3408

Table of Contents