Installation Steps - Kohler K-5401TW-2-0 Installation Manual

Veil+ intelligent toilet
Hide thumbs Also See for K-5401TW-2-0:
Table of Contents

Advertisement

INSTALLATION OF REMOTE CONTROLLER HOLDER
NOTE: If the installation wall is made of special material (such as wood board, density board and etc.), suitable
fixing methods shall be adopted.
NOTE: The place to install the remote control where it will not easily be splashed by water.
Choose a mounting location for the remote holder that is easily accessible while sitting on the seat.
Drill two holes with depth larger than 45mm on the wall by drill with a diameter of 6mm in accordance with the
position of screw holes on the remote control holder. Install the expansion tube into the holes.
Place the installation holder on the fixing hole.
Peel off the release paper of the double-sided tape at the back of holder.
Fix the holder with screws and install it.
Install the screw so it is covered.
Place the remote controller on the holder.

Installation Steps:

Kohler Co.
Expansion
Expansion screw
pipe
Hook plate
Fig.#19
Screw
Hook
Fig.#20
11
Public Anti-loss Installation
Remove the
silicome plug
Remove the
silicome plug
Remote control
1422537-TW01-A
Dock
Seat gasket

Advertisement

Table of Contents
loading

Table of Contents