Installation - Orion F9S936 User Manual

19” digital color
Table of Contents

Advertisement

INSTALLATION

NO TOOLS ARE REQUIRED TO INSTALL THE MONITOR.
SIMPLY FOLLOW THE INSTRUCTIONS OUTLINED IN THE
NEXT FEW PAGES.
1. CONNECT THE SIGNAL CABLE
A. ATTACHED SIGNAL CABLE
1) If the signal cable is attached on the monitor, connect the other and
into the graphic card on back of the computer.
2) Secure the connection with the screws on the plug.
B. DETACHED SIGNAL CABLE
1) Connect one end of the signal cable to the back panel of the monitor
and connect the other end to the graphic card on back of the computer.
2) Secure the connection with the screws on the plug.
2. CONNECT THE POWER CORD
Connect the female end of the power cord to the power input
receptacle on the back panel of the monitor.
Then, plug the male end of the power cord to an AC outlet or computer.
3. TILT/SWIVEL STAND
The Tilt/Swivel Stand is installed already, when this monitor set manufactured.
4. MAKING THE RIGHT CONNECTIONS
1) Make sure the power to this monitor and the computer system is
turned OFF.
2) Connect the D-SUB connector of signal cable to system.
3) Connect one end of the power cord to this monitor and the other
end to the wall or P/C outlet.
4) Turn this monitor ON.
5) Start your system.
INSTRUCTION MANUAL
6

Advertisement

Table of Contents
loading

Table of Contents