General; System Start-Up And Shut-Down; Start-Up Procedure For Each Gyro Compass - Simrad GC80 Dual MK2 User Manual

Hide thumbs Also See for GC80 Dual MK2:
Table of Contents

Advertisement

4.1

General

Note!
Caution!
4.2

System Start-up and Shut-down

OR
GC80 CONTROL
UNIT
STD VERSION
13
In GC80/85 Dual systems, both Gyro compasses may be operated
individually as single Gyro systems. Gyro 1 and Gyro 2 is operated by NO.1
panel and NO.2 panel on the Dual MK2 Control unit.
The start-up procedure and configuration is identical for each Gyro, and
has to be performed for both Gyro compasses before the Dual function
can be started. The start-up procedure may be performed simultaneously
for both compasses.
Before the Gyro compass is turned into normal operation, it has to be
configured according to the description in System start-up and software
configuration, page 62 onwards.
A GC80/85 Gyro compass is usually left with power on. If the system has to
be shut down and restarted, follow the procedures described in the
following sections.

Start-Up procedure for each Gyro compass

1
Turn ON each Gyro compass by pressing the POWER button on the
Control panel. Follow the start-up sequence.
2
Control unit type (GC80 Std, or GC85 HSc), software version for
Control unit and for Master compass is displayed in rapid succession.
Examples of display text are shown below:
GC85 CONTROL
UNIT
HIGH SPEED
VERSION
SOFTWARE VERSION
CONTROL UNIT
OPERATION
SOFTWARE VERSION
MASTER COMPASS
988-12720-002

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gc85 dual mk2Gc80/85

Table of Contents