Summary of Contents for Arrow Storage Products EZEE SHED
Page 1
EZ10872HVCRCC EZ10872HVCRCCEU Gloves must be worn at all times to reduce EZ10872HVCC EZ10872HVCCEU risk of injury! EZ10872HVCCCR EZ10872HVCCCREU 10’ x 8’ EZEE SHED Base Size BUILDING DIMENSIONS Exterior Dimensions Interior Dimensions Door Approx. Storage (Roof Edge to Roof Edge) (Wall to Wall)
Page 2
SAFETY PRECAUTIONS... Safety precautions MUST be followed at all times throughout the construction of your building! IMPORTANT NOTE ON ANCHORING...
Page 3
ASSEMBLY TIPS & TOOLS Watch the Weather Closely: Use Teamwork: Tools and Materials: • Work Gloves WHAT YOU NEED • Safety Glasses • Step Ladder • No. 2 Phillips Screwdriver (Magnetic Tip Preferred) • Utility Knife or Scissors • Pliers •...
Page 6
PANEL & CHANNEL ASSEMBLY TIPS PANEL CHANNEL ##### Part No. Part Quantity Needed Cues Part Cues End View Part Name Part Numbers present before attempting to assemble your building. 1. Each part has an identifying part number on it. 2. Part Numbers are referenced in each step. 3.
Page 7
CARE & MAINTENANCE... Exterior Care: DO NOT STORE POOL CHEMICALS IN YOUR SHED - THIS VOIDS YOUR WARRANTY Roof: Fasteners: General: Keep these assembly instructions and owner’s manual for future reference.
Page 8
HARDWARE LIST... Hardware Views by Key No. Key Part Part Qty. Description List 65923 Bolt (#8-32 x 3/8) (10 mm) 65103 Hex Nut (#8-32) 65004 Screw (#8AB x 5/16) (8 mm) 66646 Washer Sheet 66715 Door Handle 66718 Hinge 66720 Padlock Eyelet Corner Cap 66860...
Page 9
PARTS LIST... Key Part Part Qty. Selected End Views by Key No. Description List 11035 Floor Channel (unpainted) 1,3,4,5,8 2 & 9 11034 Ramp (unpainted) 10275 Door Brace Horizontal (painted) 11017 Door Brace Vertical (painted) 11027 Door Brace Vertical (painted) 10,11,15 11024 Door Jamb...
Page 14
CONSTRUCTING A BASE... OPTION 1: Directly on ground (earth) OPTION 2: Wood Platform If you decide to build your own base, be sure to select the appropriate materials. These are the recommended materials for your base: NOTE: If Pressure Treated Lumber comes in contact with your storage building your warranty will be voided.
Page 15
Step 1: Side Walls (2X) You will need for this page: 11019 10341 10340 (QTY: 4) (QTY: 4) Wall Channel Assemblies (Painted) Floor Channel Assemblies (Unpainted)
Page 16
Step 1: Side Walls (2X) You will need for this page: 10998 10999 11000...
Page 17
Step 1: Side Walls (2X) You will need for this page: (QTY: 8)
Page 18
Step 1: Side Walls (2X) You will need for this page: IMPORTANT START ASSEMBLY AT CORNER PANEL...
Page 19
Step 1: Side Walls (2X) IMPORTANT You will need for this page: START ASSEMBLY AT CORNER PANEL 10280...
Step 3: Front Wall You will need for this page: 11028 11037 11033 (QTY: 2) Wall Channel Assembly (Painted)
Page 25
Step 3: Front Wall You will need for this page: 11019 11034 11035 (QTY: 4) Floor Channel Assembly (Unpainted)
Page 26
Step 3: Front Wall You will need for this page: 11000 11024 10998 11004 (QTY: 6) (QTY: 2) RIGHT LEFT RIGHT RIGHT...
Page 27
Step 3: Front Wall IMPORTANT You will need for this page: START ASSEMBLY AT CORNER PANEL 10280 (QTY: 4) (QTY: 4) RIGHT LEFT IMPORTANT START ASSEMBLY AT CORNER PANEL...
Step 4: Right Door Assy You will need for this page: 11017 11026 11025 66715 66721 (QTY: 4) (QTY: 4) 66866...
Page 29
Step 4: Right Door Assy You will need for this page: 11002 11009 11008 10275 (QTY: 4)
Page 30
Step 4: Right Door Assy You will need for this page: 10288 (QTY: 3) (QTY: 9) BACK FRONT THIS END UP WHEN HANGING DOOR...
Page 31
Step 5: Left Door Assy You will need for this page: 11017 11027 66721 66720 (QTY: 2)
Page 32
Step 5: Left Door Assy You will need for this page: 11002 11009 11008 10275 (QTY: 4)
Page 33
Step 5: Left Door Assy You will need for this page: 10288 66719 66713 (QTY: 7) (QTY: 9) BACK THIS END UP WHEN HANGING DOOR FRONT...
Page 34
Step 6: Roof pre-assy You will need for this page: 11019 10336 10337 (QTY: 8)
Page 35
Step 6: Roof pre-assy (2X) You will need for this page: 11038 (QTY: 16)
Page 36
Step 6: Roof pre-assy (2X) You will need for this page: 80121 11014 11015 11039 (QTY: 8)
Page 37
Step 6: Roof pre-assy (2X) You will need for this page: 11022 11032 (QTY: 14) Large holes face down SIDE VIEW ROOF BEAM ASSEMBLY RIGHT Large holes face down...
Step 9: Roof Assembly You will need for this page: BACK (QTY: 8) LEFT Large holes face down FRONT FRONT 5” (12.7cm) 8” (20.32cm) LEFT INSIDE OF BUILDING BACK...
Page 44
Step 9: Roof Assembly You will need for this page: 66860 (QTY: 32) BACK (QTY: 8) RIGHT FRONT Large holes FRONT face down 5” (12.7cm) 8” (20.32cm) RIGHT INSIDE OF BACK BUILDING 29,30 FRONT...
Page 45
Step 9: Roof Assembly You will need for this page: 66847 (QTY: 12) (QTY: 8) FRONT FRONT BACK (4X) BACK INSIDE OF BUILDING...
Page 46
Step 9: Roof Assembly You will need for this page: 11041 11051 (QTY: 12) FRONT FRONT (4X) (2X) BACK FRONT INSIDE OF BUILDING...
Step 10: Door Assembly You will need for this page: 11053 INSIDE OF 66718 BUILDING (QTY: 12 INSIDE OF BUILDING FRONT...
Page 48
Step 10: Door Assembly You will need for this page: (QTY: 14) FRONT...
Page 49
ARROW ACCESSORIES... ANCHOR KITS Model No. AK4 FLOOR FRAME KITS Model No. AK100 Model No. AK600 SPECIAL NOTICE ON DELIVERY: HOW TO ORDER...
Page 50
ANCHORING OPTIONS... IMPORTANT: It is important that building be anchored after construction. These are recommended ways of anchoring. Anchor into Wood or Concrete Arrow Anchoring Kit: concrete Contains: Arrow Anchoring Kit: base. Contains:...