Weider 8525 User Manual page 9

Hide thumbs Also See for 8525:
Table of Contents

Advertisement

Cable Assembly
11. During steps 11 through 24, refer to the CABLE
DIAGRAM on page 20 of this manual to verify
proper cable routing. Before beginning this sec-
tion, identify the Long Cable (23) and the Short
Cable (58) by comparing the lengths of the
cables.
IMPORTANT: While assembling the cables, do
not overtighten the bolts and nuts securing
the pulleys. The pulleys must be able to turn
freely.
12. Locate the Long Cable (23). Route the Long
Cable around the indicated 3 1/2" Pulley (15)
attached to the Top Frame (55). Be sure that the
Cable is between the Pulley and the hook and
that the end of the Cable with the ball is on
the indicated side of the hook. Tighten the 3/8"
x 3 3/4" Bolt (71) and the 3/8" Nylon Locknut (not
shown).
13. Wrap the Long Cable (23) around a "V"-Pulley
(6). Attach the "V"-Pulley and a Long Cable Trap
(50) to the indicated bracket on the Front Upright
(42) with a 3/8" x 2 1/2" Bolt (7) and a 3/8" Nylon
Locknut (21). Be sure that the Long Cable Trap
is positioned to hold the Cable in place.
14. Route the Long Cable (23) around the "V"-Pulley
(6) on the Left Arm (47). Be sure that the Cable
is in the groove of the Pulley and that the
Long Cable Trap (50) is positioned to hold the
Cable in place. Tighten the 3/8" x 2 1/2" Bolt (7)
and the 3/8" Nylon Locknut (not shown).
All manuals and user guides at all-guides.com
9
11
23
58
12
55
Ball
71
Hook
13
21
14
23
23
15
7
50
6
42
23
50
7
6
47

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wesy19510

Table of Contents