Installation; Location - Graco E-Flo Installation Manual

Iq dispense system
Table of Contents

Advertisement

Installation

Installation
All electrical wiring must be done by a qualified elec-
trician and comply with all local codes and regula-
tions.
The E-Flo iQ Dispense System is shipped in five to six
containers:
1. iQ Ram Supply Unit that includes the fully
assembled ram, electric driver, and pump.
2. iQ Dispense Valve
3. Hoses (shipped in one or two containers depending
on the number of hoses used)
4. Fittings
5. Cables and a pressure transducer
The E-Flo iQ Tandem Dispense System is shipped in
ten to eleven containers:
1. iQ Ram Supply Unit that includes the fully
assembled ram, electric driver, and pump.
2. Second iQ Ram Supply Unit that includes the fully
assembled ram, electric driver, and pump.
3. iQ Dispense Valve
4. Hoses (shipped in three or four containers
depending on the number of hoses used)
5. Fittings
6. Tandem fittings
7. Cables and a pressure transducer
8. Tandem Kit
NOTE: Additional items including CGM and accessories
may be shipped in additional containers.
This section describes how to install and set up the
E-Flo iQ system and make all the necessary component
connections.
24

Location

Remove the iQ Ram Supply Unit from its crate. Attach a
lifting sling at the proper lift locations (see F
of the pallet using a crane or a forklift.
To properly locate and anchor the iQ Ram Supply Unit
(A), see Dimensions on page 92.
Always lift the iQ Ram Supply Unit at the proper lift
locations (see F
. 3). Do not lift in any other way.
IG
Failure to lift at the proper lift locations can result in
damage to the system.
NOTE: The lift ring on the Driver (AB) is only to be used
for replacing the Driver. Do not use it to lift the entire
system.
Position the Ram Assembly (AA) so the Driver (AB),
Power Junction Box Switch (AK) and/or Disconnect
Switch (AZ), Integrated Air Controls (AG), and ADM
(AF) are easily accessible. Ensure that there is enough
space overhead for the Ram Assembly to raise fully.
Use the holes in the Ram Assembly base as a guide
and drill holes for 1/2 in. (13 mm) anchors.
Ensure that the Ram Assembly base is level in all direc-
tions. If necessary, level the base using metal shims.
Secure the base to the floor using 1/2 in. (13 mm)
anchors that are long enough to prevent the Ram
Assembly from tipping.
. 3). Lift off
IG
NOTICE
333586E

Advertisement

Table of Contents
loading

This manual is also suitable for:

333586e

Table of Contents