Hide thumbs Also See for Stylus NX100:
Table of Contents

Advertisement

Epson Stylus NX100/105/SX100/105/TX100/101/102/103/105/106/109/ME 300/ME OFFICE 360/NX110/115/SX110/115/TX110/111/112/113/115/117/119
3.
Secure point C of the tube to the Pump Housing as shown
below.
Pump Housing
Figure 4-66. Assembling the Pump Assy (2)
4.
Install the Roller Pump to the Bracket Pump. (See Fig.4-63.)
5.
Set the tube inside the Bracket Pump, and install the Bracket
Pump to the Pump Housing.
6.
Rotate the Bracket Pump shaft and make sure that the Roller
Pump shalt moves to both ends in the Groove.
Bracket Pump
Ink Tube
Figure 4-67. Assembling the Pump Assy (3)
7.
Make sure that point C is placed in the correct position. (See
Fig.4-66.)
8.
Install the Gear Pump. (See Fig.4-63.)
9.
Install the Gear Pump Idle. (See Fig.4-63.)
DISASSEMBLY/ASSEMBLY
Point C
Ink Tube
Roller Pump shaft
Groove
Bracket Pump shaft
Disassembling the Printer Mechanism

4.5.8 PF Motor

Parts/Components need to be removed in advance:
Scanner Stand/ Cover Wire
(p
68), Scanner Unit
Panel Unit
(p
72), Hopper
(p
80), Main Board
Removal procedure
1.
Pull out the PF Motor cable and the Ferrite Core from the hole of the Lower
Housing to release them.
Rib
PF Motor cable
Figure 4-68. Removing the PF Motor (1)
2.
Remove the Grounding Spring from the hook of the Main Frame and the
Bracket.
Hook
PF Roller
Bracket
Figure 4-69. Removing the PF Motor (2)
Revision C
(p
70), Middle Housing
(p
71)
(p
73)
Ferrite Core
PF Motor
Grounding Spring
Tip of the Grounding
Spring
Hole
Confidential
90

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents