8.2.5 To fill the heating system
EPRA08~12EAV3+W1 + ETSH/X(B)12P30+50EF
Daikin Altherma 3 H MT ECH₂O
4P663478-1 – 2021.07
DANGER: RISK OF ELECTROCUTION
During the filling process, water can escape from any leaking point and can cause an
electrical shock if it comes into contact with live parts.
▪
Before the filling process, de-energise the unit.
▪
After the first filling and before switching on the unit with the mains switch, check
whether all electric parts and connection points are dry.
1 Connect a hose with a non-return valve (1/2") and an external manometer
(field supply) to a water tap and the fill and drain valve. Secure the hose
against slipping off.
e.1
e.2
B
A
f
a
g
b
h
a Hose with a non-return valve (1/2") and an external manometer (field supply)
b Fill and drain valve
j/k
50%
AB
0%
CH
(B)
d
c
j
k
50%
i
0%
CH
(A)
8
Piping installation
|
100%
Bypass
(A)
100%
DHW
(B)
Installer reference guide
95