To Connect A Pressure Vessel; To Fill The Heating System - Daikin Altherma 3 R ECH2O Installation Manual

Hide thumbs Also See for Altherma 3 R ECH2O:
Table of Contents

Advertisement

5 Piping installation
b
c
a
Space heating/cooling water OUT (screw connection, 1")
b
Space heating/cooling water IN (screw connection, 1")
c
Domestic hot water OUT (screw connection, 1")
d
Domestic cold water IN (cold water supply)(screw
connection, 1")
NOTICE
It is recommended to install shut-off valves on the space
heating/cooling water in and out connections, as well as on
the domestic cold water in and domestic hot water out
connections. These shut-off valves are field supplied.
NOTICE
Install air purge valves at all local high points.
NOTICE
A pressure relief valve (field supply) with an opening
pressure of maximum 10  bar (=1  MPa) must be installed
on the domestic cold water inlet connection in accordance
with the applicable legislation.
5.4.2

To connect a pressure vessel

1 Connect a suitably dimensioned and preset pressure vessel for
the heating system. There may not be any hydraulic blocking
elements between the heat generator and the safety valve.
2 Position the pressure vessel in an easily accessible place
(maintenance, parts replacement).
Installation manual
20
a
d
5.4.3

To fill the heating system

DANGER: RISK OF ELECTROCUTION
During the filling process, water can escape from any
leaking point and can cause an electrical shock if it comes
into contact with live parts.
▪ Before the filling process, de-energise the unit.
▪ After the first filling and before switching on the unit
with the mains switch, check whether all electric parts
and connection points are dry.
1 Connect a hose with a non-return valve (1/2") and an external
manometer (field supply) to a water tap and the fill and drain
valve. Secure the hose against slipping off.
e.1
e.2
B
j/k
AB
A
f
a
g
b
i
h
a
Hose with a non-return valve (1/2") and an external
manometer (field supply)
b
Fill and drain valve
c
Space heating/cooling water OUT
d
Space heating/cooling water IN
e.1
Valve motor
e.2
Valve motor latch
f
Water tap
g
Automatic air purge valve
h
Pressure gauge (field supply)
i
Pressure vessel (field supply)
j
Bypass valve
k
Tank valve
2 Prepare for air purging according to the instructions (see
purge" [ 4  45]).
"8.2.2 To perform an air
3 Open the water tap.
4 Open fill and drain valve and monitor the manometer.
5 Fill the system with water until the external manometer shows
that the system target pressure is reached (system height +2 m;
1 m water column = 0.1 bar). Make sure that the pressure relief
valve does not open.
6 Close the manual air vent valves as soon as water emerges
free of bubbles.
50%
0%
100%
Bypass
CH
(B)
(A)
d
c
j
k
50%
100%
0%
CH
DHW
(A)
(B)
EBSH/X(B)11+16P30+50DF
Daikin Altherma 3 R ECH₂O
4P663483-1A – 2021.11