    Pouring the Deck... 25 Spa Technical Specifications ... 26 Copyright 2008 Lloyds Material Supply, Inc. All rights reserved. Duplication with- out written consent is strictly prohibited. Cal Spas is a registered trademark. ® Due to continuous improvement pro- grams, all models, operation, and/or specifications are subject to change with- out prior notice.
  • Page 3: Pre-Delivery And Installation Checklist

    Pre-Delivery and Installation Most cities and counties require permits for exterior construction and electrical circuits. In addition, some communities have codes requiring residential barriers such as fencing and/or self-closing gates on property to prevent unsupervised access to the property by children under the age of 5.
  • Page 4: Planning The Best Location

    Planning the Best Location Safety first Do not place your spa within 10 feet (3 m) of overhead power lines. Make sure the spa is positioned so that access to the equipment compartment and all side panels will not be blocked. Be certain that your installation will meet all city and local safety codes and requirements.
  • Page 5 Allow for service access Many people choose to install a decorative structure around their spa. If you are installing your spa with any type of structure on the outside, such as a gazebo, remember to allow access for service. It is always best to design special installations so that the spa can still be accessed.
  • Page 6: Portable Spa Site Preparation

    Note: It is strongly recommended that a qualified, licensed contractor prepare the foundation for your spa. Your Cal Spas retailer can help you with your foundation and more. Your ® retailer has a wealth of information and experience about how to get the most out of your spa and can provide you with a full line of accessories that are designed to complement your spa and increase your enjoyment.
  • Page 7 • The spa must be properly back-filled with wet sand, underneath and on all four sides. • The final architecture must include permanent ground coverage within a 10 feet radius of the spa. • Never place any spa in a sealed area. Water must be able either to be absorbed into the surrounding area or channeled away.
  • Page 8: Getting The Spa Into Your Yard

    Getting the Spa Into Your Yard Check the Dimensions of Your New Cal Spa The Cal Spas specification chart lists your spa’s model and its dimension ® as it sits on the delivery cart. During delivery, the spa must remain on the delivery cart at all times.
  • Page 9 • Are there protruding gas meters, water meters or A/C units on your home which will cause obstructions along the delivery path to your yard? • Are there stairs in your delivery route? If so, you must consult your Cal Spas dealer prior to delivery to make adequate preparations.
  • Page 10: Electrical Requirements

    Electrical Requirements Electrical Requirements – US and Canada 240 Volt Electrical Installation All 240V spas must be permanently connected (hardwired) to the power supply. These instructions describe the only acceptable electrical wiring procedure. Spas wired in any other way will void your warranty and may result in serious injury.
  • Page 11 Spa Model All 240V spas (except 6300 control boxes requiring high amperage - see below) Spas with the 6300 control box (when high amperage is selected on circuit board) SEE CONFIGURATION INSTRUCTIONS ON NEXT PAGE. Fitness spa with 5.5 kW heater Fitness spa with two 11 kW heater and Fitness...
  • Page 12: Testing The Gfci Breaker

    Testing the GFCI Breaker Test the GFCI breaker prior to first use and periodically when the spa is powered. To test the GFCI breaker follow these instructions (spa should be operating): Press the TEST button on the GFCI. The GFCI will trip and the spa will shut off.
  • Page 13 GFCI Wiring Diagram...
  • Page 14: Volt Electrical Installation

    The spa is now safe to use. If the GFCI trips while the spa is in use, press the RESET button. If the GFCI does not reset, unplug the spa and call your local Cal Spas for service. DO NOT USE THE SPA! dealer ®...
  • Page 15: Electrical Installation -- Europe

    Electrical Installation -- Europe 230 Volt Electrical Installation All 230V spas must be permanently connected (hardwired) to the power supply. These instructions describe the only acceptable electrical wiring procedure. Spas wired in any other way will void your warranty and may result in serious injury.
  • Page 16 Spa Model All 230V spas (except 6205 control boxes requiring high amperage - see below) Spas with the 6300 control box (when high amperage is selected on circuit board) SEE CONFIGURATION INSTRUCTIONS ON NEXT PAGE. Ultimate Fitness spas with one 5.5 kW heater Ultimate Fitness spas with two 5.5 kW heaters Designer in-ground spas...
  • Page 17 RCD Wiring Diagram...
  • Page 18: Installing The In-Ground Shell

    Installing the In-Ground Shell...
  • Page 19: Equipment Pack Plumbing Connections (In-Ground Spas)

    Equipment Pack Plumbing Connections (In-Ground Spas) The example shown below is typical for a system with two pumps with external heater and external filter. Designer Spa Specifications DIJ401 – DIJ406: Equipment pack weight = 250 lbs. DIJ407: Equipment pack weight = 300 lbs. 2.5 HP heat pump 4 HP swim pump Note:...
  • Page 21: Plumbing Connections

    Plumbing Connections IMPORTANT! Always check local codes prior to any in-ground spa installation. Once the spa and equipment are properly located, you will want to lay out the plumbing run. Trenches should be deep and wide enough to allow all pipes to be buried below the frost line and should be in as straight a line from the spa to the equipment as possible.
  • Page 22 NOTE: Once complete, water test the plumbing run for at least three days prior to covering any plumbing trenches and back-filling spa cavity completely. NOTE: Some local inspectors require pressure testing the plumbing lines. Although the spa is pressure tested at the factory, local inspectors may insist on pressure testing the plumbing run between the spa and equipment pack.
  • Page 23: Electrical And Electronic Connection

    Air Venturi: 1/2” line that is plumbed 18” above the spa’s water level. Topside Control Panel and Temp Sensor: 1” line that connects to the bottom of the control box located on the equipment pack. Electrical and Electronic Connection Remote Equipment Topside Control Panel The next few steps to complete the installation should be performed along with installation of the temperature sensor and 12V spa light wiring (if applicable).
  • Page 24 NOTE: Circuit board programming will not allow spa operation without both the temperature and high limit sensors being properly connected to the circuit board. Once topside panel operation is verified. Turn off power, disconnect the extension loom from the circuit board and GENTLY route through conduit to complete installation.
  • Page 25 Light niche and any metallic items in a 5’ (152 cm) radius must be properly bonded with #8 AWG grounding wire. Connect rigid conduit to the 3/4” hub located at the back of the light niche and run to a water resistant junction box (or for 12 volt models to a low voltage transformer) no further than 25’...
  • Page 27: Pouring The Deck

    Pouring the Deck It is recommended that all electrical hook ups and all plumbing be completed before pouring the concrete. Make certain all electrical inspections on lights, bonding and all other electrical work have been completed and checked off by the local inspectors prior to proceeding with your concrete or finish work.
  • Page 28: Spa Technical Specifications

    Spa Technical Specifications All sizes on this chart represent top-rail dimensions. Due to our continuous improvements, specifications, size and pricing are subject to change without prior notice. Avalon Series Model Width A726B 84” A726L 84” A744B 84” A744L 84” A826B 93”...
  • Page 29 Classic and Legacy Series Model Width CL-24 64” LL-24 CP-34 84” LP-34 CT-34 84” LT-34 CA-34 93” LA-34 CBA-34 93” LBA-34 CV-34 93” LV-34 CP-48 84” LP-48 CT-48 84” LT-48 CA-48 93” LA-48 CBA-48 93” LBA-48 CD-45 93” LD-45 CM-45 93”...
  • Page 30 Galaxy Series Model Width GX-49 93” Ultimate Fitness Series Model Width FP 2400 96” FP 2500 96” FP 4700 96” Victory Extreme Series Model Width VX-624B 76” VX-724L 84” VX-726B 84” VX-726L 84” VX-740L 84” VX-834B 93” VX-834L 93” VX-848B 93”...