Removal of Main Electrical Box / Sub Electrical Box

3. Removal of Main Electrical Box / Sub Electrical Box
Procedure
Step
1
Remove the 2 earth
screws.
2
Unfasten the hook and
open the sensor PCB
fixing plate.
3
Remove the front
shield plate.
4
Remove the 1 screw of
the wiring fixture and
remove the 4 screws of
the connection wires.
5
Remove the screw and
remove the terminal
board.
6
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Procedure
Hook
Sensor PCB
fixing plate
Earth
screw
Front shield
plate
Wiring fixture
(R12439)
(R12440)
Connection
wires
(R12441)
Terminal
board
(R12442)
Si061062
Points
Removal Procedure