Download Print this page

MTD 19C70020OEM Operator's Manual page 13

Twin rear bagger

Advertisement

Installing the Deck Chute
NOTE: Check the upper chute for a cardboard insert installed
for shipping purposes. If the insert is present, remove it before
continuing with Step 1.
1.
Peel the backing off of the self-adhesive foam strip
(721-04388) that has been included within your Carton of
Contents. Apply it to the upper chute, flush against the
flange as shown in Figure 4-20.
Flange
Figure 4-20
2.
With the grass catcher cover open, install the upper
discharge chute through the discharge chute opening, as
shown in Figure 4-21.
Figure 4-21
3.
With the ability now to wiggle the discharge chute tube
back and forth, slide it over the chute elbow mounted on
the cutting deck, as shown in Figure 4-22.
Figure 4-22
4.
Continue to work the discharge chute down over the chute
elbow until the groove on the discharge chute aligns with
the upper chute support, as shown in the inset of Figure
4-23.
Figure 4-23
5.
Close grass catcher cover.
6.
Raise the deck back up into the desired cutting position.
S
ection
4 — A
& i
SSembly
nStAllAtion
13

Advertisement

loading