To Drill A Wall Hole; To Remove The Pipe Port Cover - Daikin FAA-B Installation And Operation Manual

Split system air conditioner
Table of Contents

Advertisement

12 Unit installation
A
a
103
f
d
e
60
85
B
a
80
f
d
e
a
65
164
A
Pattern for installation with mounting plate for class 71
B
Pattern for installation with mounting plate for class 100
a
Recommended fixing spots
b
Pocket for the pipe port cover
c
Tabs for placing a spirit level
d
Through-the-wall hole Ø80 mm
e
Drain hose position
f
Position for the tape measure at symbol " "
g
Gas pipe end
h
Liquid pipe end
i
Temporary fixing hole
12.2.2

To drill a wall hole

CAUTION
For walls containing a metal frame or a metal board, use a
wall embedded pipe and wall cover in the feed-through
hole to prevent possible heat, electrical shock, or fire.
NOTICE
Be sure to seal the gaps around the pipes with sealing
material (field supply), in order to prevent water leakage.
1 Drill a 80  mm large feed-through hole in the wall with a
downward slope towards the outside.
2 Insert a wall embedded pipe into the hole.
3 Insert a wall cover into the wall pipe.
Installation and operation manual
14
b
a
c
a
a
480
1050
b
a
a
543
1200
i
c
a
h
g
a
a
344
389
411
c
a
c
i
a
h
g
393
459
503
a b
c
a
Wall embedded pipe (field supply)
b
Putty (field supply)
c
Wall hole cover (field supply)
4 After completing wiring, refrigerant piping and drain piping, do
NOT forget to seal the gap with putty.
12.2.3

To remove the pipe port cover

INFORMATION
To connect the piping on right-side, right-bottom, left-side
or left-bottom, the pipe port cover MUST be removed.
a
52
f
d
e
104
98
a
36
f
d
e
186
89
a
FAA71+100BUV1B
Split system air conditioner
3P654518-1A – 2021.03
(mm)
(mm)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Faa71buv1bFaa100buv1b

Table of Contents