Toshiba W7 DN-57442-006 Installation & Operation Manual page 26

Adjustable speed drives
Table of Contents

Advertisement

Installation and Connections
W7B ASD Installation & Operation Manual
Startup and Test
DANGER
Perform the following checks before turning on the
ASD:
• L1/R, L2/S, and L3/T are connected to the 3-
phase input power.
Table 6. ASD Parameter Changes by Installer/Maintenance Personnel.
ASD ID__________Name:______________________Date:_______
Parameter
Parameter Name
Number
Note: Settings may also be recorded via Program  Utilities  Type Reset  Save User
Settings.
16
• T1/U, T2/V, and T3/W are connected to the
motor.
• The 3-phase input voltage is within the
specified tolerance.
• There are no shorts and all grounds are
secured.
Use the following table to record any changed
parameters for future reference.
Default or
New Setting
Previous Setting
Notes
Unit of
Measure
https://www.toshiba.com/tic/

Advertisement

Table of Contents
loading

Table of Contents