Water Piping And Trim - Burnham ALP105 Installation, Operating And Service Instructions

Burnham corp. gas-fired hot water boiler installation, operating and service instructions
Table of Contents

Advertisement

Vi. Water Piping and Trim
Failure to properly pipe boiler may result in improper operation and damage to boiler or structure.
install boiler so that the gas ignition system components are protected from water (dripping, spraying,
rain, etc.) during appliance operation and service (circulator replacement, etc.).
nOTiCE
Oxygen contamination of boiler water will cause
corrosion of iron and steel boiler components,
and can lead to boiler failure. Burnham's Standard
Warranty does not cover problems caused by
oxygen contamination of boiler water or scale
(lime) build-up caused by frequent addition of
water.
Do not fill boiler with softened water to prevent
chloride contamination.
WaRning
Figure 0: Factory Supplied Piping and Trim installation
Installation of Factory Supplied Piping and Trim
A.
Components
Alpine (ALP) boilers have factory supplied
Miscellaneous Part Carton (P/N 101777-01 – ALP080
thru ALP210; 101777-02 – ALP285; 101777-03
– ALP399), which includes supply piping components,
gas piping components, Temperature & Pressure Gauge,
Pressure Relief Valve and Drain Valve. See Figure 30
" Factory Supplied Piping and Trim Installation". Install
these components prior to connecting boiler to system
piping as follows:
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Alp210Alp080Alp150Alp285Alp399

Table of Contents