Environmental Compliance Requirements - Microsoft Surface Pro 7+ for Business WIFI Removal Procedure

Ssd removal
Table of Contents

Advertisement

3. Replace SSD door.
4. Imaging – Image the new SSD by using a BMR Imaging USB drive specific to the device model.
IMPORTANT:
5. Run SDT – Run SDT to ensure all device features and functions operate as expected.

Environmental Compliance Requirements

All waste electrical and electronic equipment (WEEE), waste electronic components, waste batteries, and electronic
waste residuals must be managed according to applicable laws and regulations. and H09117, "Conformance
Standards for Environmentally Sound Management of Waste Electrical and Electronic Equipment (WEEE)," which is
available at this link:
AskECT@microsoft.com
13
Refer to Surface imaging process -
https://www.microsoft.com/download/details.aspx?id=11691
Surface Imaging Tools
© 2021 Microsoft.
M1177096
In case of questions, please contact

Advertisement

Table of Contents
loading

This manual is also suitable for:

Surface pro 7+ for business lte19601961

Table of Contents