Goodman ACVC96 BA Series Service And Troubleshooting page 21

Table of Contents

Advertisement

SYSTEM OPERATION
45 degree
barb-pipe
adapter
Installer selects right or left side drain
and installs this hose accordingly.
Drain Exiting Left Side
1. Install the 45 degree pipe / hose drain coupling from the
outside of the cabinet (barbed end goes in the cabinet)
through the hole in the left side of the cabinet and secure
with two field supplied #8 self-tapping screws (see Figure
23).
2. Locate the long drain hose #3 and cut at "B" line for a
17.5" cabinet; cut at line "C" for a 21" cabinet; do not cut
for a "D" width cabinet.
3. Install large end of hose #3 to trap outlet and secure with
1.25" clamp.
4. Install smaller end of hose #3 on 45÷ elbow and secure
with 1" clamp.
5. Refer to Field Supplied Drain section for instructions on
field supplied / installed drain on outlet of furnace trap.
Upflow Model Installed Horizontally with
Right Side Down
Minimum 5 ½" clearance is required for the drain trap beneath
the furnace.
Hose #1
Hose #2
45 degree
barb-pipe
adapter
Figure 23
Hose #11
1. Remove the clamps from both ends of the drain hoses.
2. Remove the two screws holding the drain trap to the
blower deck.
3. Remove the trap and two hoses from the blower deck
4. Remove the two plugs from the right side of the cabinet
and install them in the blower deck.
5. (Draining the Vent Elbow) Locate hose #2 (factory
installed) and cut 1" away from the 45 degree bend,
discard the 45 degree section. Insert hose #2 from outside
the cabinet through the cabinet drain hole nearest the
top. Secure it to the barbed fitting in the elbow with a red
clamp.
6. (Draining the Collector Box) Install the non-grommet end
of hose #11 from outside the cabinet in the bottom drain
hole. Install on collector box and secure with a silver
clamp.
7. Use two silver clamps and secure the hoses to drain trap.
The trap outlet faces the front of the furnace. Secure the
trap to the cabinet using two screws removed in step 2
by inserting the two screws through the large set of holes
in the top mounting tabs of the trap into the two predrilled
holes in the side of the cabinet.
8. Refer to Field Supplied Drain section for instructions on
field supplied / installed drain on outlet of furnace trap.
Upflow model installed horizontally with left
side down
Minimum 5 ½" clearance is required for the drain trap beneath
the furnace.
*Also see Front Cover Pressure Switch Tube Location.
Hose #2
Figure 24
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Amvc96 ba seriesGcvc96 ba seriesGmvc96 ba series

Table of Contents