Removing the Reel Drive Belt (continued)
Installing the Reel Drive Belt
Traction and Reel Drive Systems: Service and Repairs
5. Remove the reel drive belt (2) from the pulleys.
1. Ensure that the carriage bolt (4) is loose enough to move the idler arm (3)
freely.
2. Place the new drive belt (2) onto the pulleys.
3. Adjust the reel belt tension; refer to
4. Ensure that the reel drive gasket (5) is in position and install the reel drive
cover (6) to the reel drive assembly (1) and secure with the 4 socket head
screws (7).
5. Torque tighten the socket head screws to 1.7 to 4.5 N∙m (15 to 40 in-lb).
Use an alternation pattern and torque tighten the socket head screws to 9.6
to 10.7 N∙m (85 to 95 in-lb).
6. Connect the battery pack; refer to
(page
5–3).
Adjusting the Reel Drive Belt (page
Connecting the Lithium Battery Pack
Page 4–6
4–3).
Greensmaster
®
eFlex 1021
20248SL Rev A