Accessories - Furuno WR110 Installation Manual

Weather radar
Hide thumbs Also See for WR110:
Table of Contents

Advertisement

2.4. Accessories

Items
100Base-T (STP Cat5e or better), Length depends on
LAN cable
measure value. Incl. LAN connector w/ cover
Shielded VCTF 2sq 3core or equivalent
AC Power cable
Incl. crimped Terminal
Tube conduit Inner diameter : 28 mm
Protective tube
Flexible PV (polyvinyl chloride) tube (IP65)
Accessories for installation
Items
Lifting Tool
M16 nut
M16 Flat Washer
M16 Split Lock Washer
M16x200mm bolt
M16 Large Flat Washer
M16x40mm High nut
HOSE CLAMP
M4x35mm Bolt
SILICON SEALANT
CRIMP-ON LUG
Items
Security lock key
Maintenance tool box
M10 x400mm threaded bolt
M10 nut
Spring clamp
Handle
*1)
Nominal length is shown which is from the length of protective tube length between ATU and JCU. These
cables have extra length for inside equipment. (e.g.: 5m cable = 5m + approx.2m).
The cable length between ATU and JCU can be selectable from 5m /10m/ 15m/ 20m (shown in nominal
length).
*2)
30m protective tube will be shipped even the length of cable is 5m each between ATU and JCU. The rest of
the protective tube (25m) can be used between JCU and DPU and it should be connected JCU tube
connector for secure water proof of JCU. If it needs to extend protective tube by jointing other protective
tube, it should use weather proof silicon to glue the joint part.
Note: Mostly it will be necessary to consult to build a tower for radar installation to an expert.
Cables & Tube
Antenna Unit (radome) --- Junction Unit
Descriptions
Material : SUS304
Material : SUS304
Material : SUS304
Material : SUS304
Material : SUS304
Material : SUS304
Material : SUS304
Accessories for installation
Pole mounted
Wall mounted, Material: SUS304
For Waterproofing
For power cable from DPU (incl. 3 extra), size:M4
Accessories for maintenance
For JCU box with key x2
Size: L410x150x100 [mm]
Holding the radome cover up above in order to access inside the
radome when maintenance
Fix the length of threaded bolt for lifting up the radome
Holding the radome cover up above in order to access inside the
radome when maintenance
Lifting radar out/in from radome
12
(Fixed radome and stand)
Descriptions
(JCU)
Descriptions
Figure 2.1: Maintenance tool
Length
Qty
(*1)
5m
2
(*1)
5m
1
(*2)
30m
1
Qty
4
12
12
8
4
4
4
2
4
1
6
Qty
1
1
8
8
8
4

Advertisement

Table of Contents
loading

Table of Contents