Husqvarna LB 548 i Workshop Manual page 28

Table of Contents

Advertisement

4. Pull up the cables (A, B and C) and disconnect
them.
A
B
C
5. Remove the motor control box (D). Replace the
motor control box, if it is necessary.
7.9.4 To remove the battery control box
To remove and install the power unit on
1. Refer to
page 25 and To remove the cover from the power
unit on page 26 .
2. Loosen the screw and push the plastic plate to the
side.
3. Pull out the connections (A) between the battery box
and the motor and disconnect them.
28 - Repair instructions
4. Pull up the fan cables and disconnect them.
5. Remove the screws and remove the battery control
box.
D
A
1410 - 001 -

Advertisement

Table of Contents
loading

Table of Contents