Cisco Meraki MR42 Installation Manual page 7

Hide thumbs Also See for Meraki MR42:
Table of Contents

Advertisement

• Wall screws, wall screw anchors, and security screws
• Spare hardware
Safety and Warnings
These operations are to be taken with respect to all local laws. Please take the following into consideration for safe operation:
• Power off the unit before you begin. Read the installation instructions before connecting the system to the power
source.
• Before you work on any equipment, be aware of the hazards involved with electrical circuitry and be familiar with
standard practices for preventing accidents.
• Read the wall-mounting instructions carefully before beginning installation. Failure to use the correct hardware or to
follow the correct procedures could result in a hazardous situation to people and damage to the system.
• This product relies on the building's installation for short-circuit (overcurrent) protection. Ensure that the protective
device is rated not greater than: 15 A, 125 Vac, or 10A, 240 Vac.
• Please only power the device with the provided power cables or standard PoE to ensure regulatory compliance.
Pre-Install Preparation
You should complete the following steps before going on-site to perform an installation.
Configure Your Network in Dashboard
The following is a brief overview only of the steps required to add an MR42 to your network. For detailed instructions about creating, configuring and managing
Meraki wireless networks, refer to the online documentation (documentation.meraki.com).
7

Advertisement

Table of Contents
loading

Table of Contents