Exmark Ultravac Bagger 126-8680 Operator's Manual page 15

Hide thumbs Also See for Ultravac Bagger 126-8680:
Table of Contents

Advertisement

1. Dimple
16.
Set the deck in lowest cutting position.
17.
Slide the lower tube onto the blower and attach
the latches. (Make sure that the upper tube does
not move out of alignment).
18.
If the lower tube is replaced, drill three 7/32 inch
holes in the lower tube using the upper tube holes
as reference. See Figure 16.
19.
Remove the tubes from unit and assemble the
upper and the lower tubes using three #10-24
x 3/4 inch hex washer head screws, three #10
washers, and three #10-24 nyloc nuts. The screw
head should be installed to the inside of the
tube to provide minimum obstruction to flow.
Make sure that the upper and the lower ends are
oriented properly as the tubes are assembled.
1. Drill the holes here
Figure 15
Figure 16
20.
Slide the lower end of the tube assembly over the
blower outlet and align the notch with the tube
latch. Latch the tube to the blower.
21.
Install the caster weights.
A.
On the LH side, insert the 3/8-16 x 6 1/2
inch screw into hole on the bottom side of the
bracket and the rear of the removable 45 lb
(20.4 kg) caster weight as shown in Figure 17.
Carefully place the weight and bracket
assembly onto the caster arm centering the
hole of the weight over the caster wheel.
g007027
1. 3/8-16 x 6 1/2 inch screw 6. Hairpin
2. Knob
3. Bracket
g007028
4. 45 lb (20.4 kg) caster
weight
5. Clevis pin
15
Operation
Figure 17
7. 20 lb (9.1 kg) caster
weight
8. 3/8-16 inch nyloc nut
9. Washer
10. 3/8-16 x 8 inch screw
g242048

Advertisement

Table of Contents
loading

Table of Contents