Haier QFD15 Series Owner's Manual & Installation Instructions page 23

Table of Contents

Advertisement

Available languages

Available languages

FINAL SETUP
LEVEL THE DRYER
1
Stand the dryer upright near the final location and adjust
the four leveling legs at the corners to ensure that the
dryer is level from side to side and front to rear.
Lower
Raise
PLUG DRYER IN
2
NOTE: Stacking installations may require a power
cord up to 6 feet in length.
49-3000195
INSTALLATION INSTRUCTIONS
Ensure proper
ground exists
before use.
DRYER START-UP
3
Press and hold the power button.
NOTE: If the dryer has been exposed to temperatures
below freezing for an extended period of time, allow it to
warm up before pressing Power. Otherwise, the display
will not come on.
The dryer is now ready for use.
WARNING
- Electrical Shock Hazard
Disconnect power supply before servicing.
Replace all parts and panels before operating.
Failure to do so can result in death or electrical
shock.
23

Advertisement

Table of Contents
loading

Table of Contents