Installation; Positioning And Levelling - Hussmann MPD116 Installation Manual

Medium temperature remote cabinet, multideck door
Table of Contents

Advertisement

INSTALLATION

3.1

POSITIONING AND LEVELLING

Unwrap the cabinet and remove the shipping braces.
Lift up cabinet and remove shipping base.
FIGURE 3A - Remove Shipping Base
To position the cases:
1. If the plinth surface is not level, determine
where the highest point of the plinth is, and
position the case allocated to this position first.
2. Snap a chalk line on the floor to use as a guide for
positioning the front of the cases in the line-up.
Determine the position of the case and choose a
part of the case that will relate to the chalk line.
3. Adjust the case height using the adjustable feet to
ensure the case is level to within +/- 1.5mm from
front to back and side to side and chassis of case is
NOT twisted. Maximum 30mm adjustment.
Refer to and follow the manual handling policies of
your Company when moving cases
Cases must not be positioned in areas that may be
subject to heat or air currents such as ventilation ducts,
open doors or windows, direct sunlight, electric fans or
ovens, etc.
PAGE 13
NOTE:
Information in this manual
is to be followed in conjunction with
specifications, work practices and
regulations of the customer, installing
company and relevant industry.
CAUTION:
Ensure the lifting capacity
of the trolley, etc is sufficient for the
case. Refer to the product engineering
data tables at the front of this manual
for case weights and Risk Analysis
(page 36).
The rating plates will also
detail weight/size.
FIGURE 3B - Levelling Feet
MPD GLASS DOOR MULTIDECK - HUSSMANN