4.2 Assembly SOP
Preparation before assemble
1. Clean the room for work
2. Identify the area for material
3. Prepare the implement, equipment, material as bellow:
1) Working table
2) Philips-head screwdriver
3) Glove
4) Cleaning cloth
5) ESD protection
Item
1
2
3
Picture
Operation
1. Assemble wire to G-Sync
module
2. Assembly G-Sync module
on I/F board and fix it by
screw*2
3. Fix G-Sync wire by tape
1. Insert cables to connect
SPS BD, I/F BD and
SPS+LED BD
1. Connect I/F BD to Docking
BD wire and I/F BD to USB
BD FFC cables with I/F BD
- 13 -
Tools
Notes
Philips-
head
screwdr
iver
(Screw
Torque:
10±0.5k
gf)
Do not touch
the component
without
wearing
insulating
gloves when
disassembling
and
assembling
Power BD