5.2 Assembly SOP
Preparation before assemble
1. Clean the room for work
2. Identify the area for material
3. Prepare the implement, equipment, material as bellow:
1) Working table
2) Philips-head screwdriver
3) Gloves
4) Cleaning cloth
5) ESD protection
Item
1
Picture
Operation
1. Insert "SPS BD wire"
into SPS BD
2. Assemble SPS BD
to Main SHD
3. Insert "EDP FFC"
into I/F BD and
paste a tape to
cover the interface
4. Insert "LED Driver
BD to I/F BD wire"
into I/F BD and LED
Driver BD
5. Insert "SPS BD wire"
into I/F BD and
assemble I/F BD to
Main SHD
6. Assemble LED
Driver BD to Main
SHD
- 14 -
Tool
Notes