Settings after completing installation

Basic settings flow
1
Set the language and time zone on
this unit.
→ Setting the language and time zone ([Language &
TimeZone stgs]) P.14
2
Set the time and date on this unit.
→ Setting the date and time ([Date settings]) P.15
3
Confirm the configuration of the air
conditioning system.
→ Confirming system configuration ([Check
configuration]) P.16
4
Set addresses and group
memberships for the indoor units.
→ Basic settings on the indoor unit ([I/D unit settings])
P.17
5
Name the area groups.
→ Changing the name of the area group ([Area group
name settings]) P.19
Make settings for steps 6 to 9 as necessary.
Set up flow for different operating styles
Step
Category step
1
Date settings
Composition
2
loading
3
Unit related
4
Group related
Pulse meter
5
related
12
Setting
Setting the current date and time
Confirming the connection
configuration
Central address*
1
Name of the indoor units
Distribution group
Area group
Control group
Not batch, not managed
Name of the outdoor units
Local remote controller prohibition
setting
Name of the area group
Name of the distribution group
Name of the schedule group
Association with the distribution
group
Type of pulse meter (electricity/
gas), multiplying factor (number of
pulse units)
Name of the pulse meter
6
Name the distribution groups.
→ Changing the name of the distribution group
([Distribution group settings]) P.20
7
Register distribution groups to be
measured in the pulse meter.
→ Basic settings for the pulse meter ([Pulse meter
settings]) P.22
8
Set the mode used for distributing
when calculating charges.
→ Set the distribution mode ([Distribution mode settgs])
P.24
9
Set specified days, cut-off days,
and target time slots for calculating
distributions.
→ Basic settings for distribution calculation ([Calndr stgs
fr DistrCalc]) P.25
: Settings required. : Settings may be required. : Settings not required.
Screen menu names
Date settings
Check configuration
I/D unit settings
I/D unit settings
I/D unit settings
I/D unit settings
I/D unit settings
I/D unit settings
O/D unit settings
Sttgs for commnctn w A/C
Area group name settings
Distribution group sttgs
Schedule group name stgs
Pulse meter settings
Pulse meter settings
Pulse meter settings
Setting finished
Operation
Air
Distribution rate
conditioning
display only
operations
Time
Load
only
2
*
*
2
Quantity used,
charges display
Time
Load