Area dose product measurement device
Concluding steps
•
Reinstall all the covers.
•
Perform the protective conductor measurement as specified in ARTD-002.731.17.
•
Perform partial acceptance tests in compliance with country-specific regulations.
Changes to previous version
Page 4 new
Siemens AG
Medical Engineering
SPR2-240.814.04
Rev. 02
07.00
Page 9 of 10 POWERMOBIL/ARCOSKOP
TD SD 24
9
1
1