Shipping And Packing List - Lennox SGH036 Installation Instructions Manual

Table of Contents

Advertisement

Shipping and Packing List

Package 1 of 1 contains:
1- Assembled unit
Check unit for shipping damage. Receiving party should
contact last carrier immediately if shipping damage is found.
CAUTION
As with any mechanical equipment, contact with
sharp sheet metal edges can result in personal injury.
Take care while handling this equipment and wear
gloves and protective clothing.
General
These instructions are intended as a general guide and do
not supersede local codes in any way. Authorities having
jurisdiction should be consulted before installation.
The SG 036 gas/electric packaged rooftop unit is available in
70,000 and 108,000 Btuh heating input. The SC 036 cooling
packaged rooftop unit is the same basic design as the SG
036 unit except for the heating section. Optional electric heat
is factory-installed in SC units. SG and SC 036 units have
identical refrigerant circuits with 3-ton cooling capacities.
The SG 060 gas/electric packaged rooftop unit is avilable in
70,000, 108,000, and 150,000 Btuh heating input. The SC 060
cooling packaged rooftop unit is the same basic design as the
SG 060 unit except for the heating section. Optional electric
heat is factory-installed in SC units. SG and SC 060 units have
identical refrigerant circuits with 5-ton cooling capacities.
The SG 120 gas/electric packaged rooftop unit is available in
130,000, 180,000, or 240,000 Btuh heating inputs. The SC
120 cooling packaged rooftop unit is the same basic design
as the SG 120 unit except for the heating section. Optional
electric heat is factory-installed in SC units. SG and SC 120
units have identical refrigerant circuits with a total of 10-ton
cooling capacities.
The SG 240 gas/electric packaged rooftop unit is
available in (260,000, 360,000, or 480,000 Btuh heating
inputs). The SC 240 cooling packaged rooftop unit is the
same basic design as the SG 240 unit except for the
heating
section.
Optional
factory-installed in SC units. SG and SC 240 units have
identical refrigerant circuits with 20-ton cooling
capacities.
1
Unit Clearance
Service Clearance
Service Clearance
Service Clearance
Clearance to Combustibles
Minimum Operation Clearance
NOTE - Entire perimeter of unit base requires support when elevated above the mounting surface. 1-Service Clearance - Required for removal of
serviceable parts. Clearance to Combustibles - Required clearance to combustible material. Minimum Operation Clearance - Required clear­
ance for proper unit operation.
507964-01
9/2019
electric
heat
is
A
in.
SG/SC 036, 060
72
SG/SC 120
72
SG/SC 240
72
All
36
All
36
Page 8
Units are equipped with multi-stage air volume (MSAVt)
supply air blowers.
Units use R410A, an ozone-friendly HFC refrigerant. Refer
to the Cooling Start-Up section (Page 29) for precautions
when installing unit.
Safety
WARNING
Electric shock hazard. Can cause injury
or death. Before attempting to perform
any service or maintenance, turn the
electrical
disconnect switch(es). Unit may have
multiple power supplies.
IMPORTANT
The Clean Air Act of 1990 bans the intentional venting
of refrigerant (CFC's and HCFC's) as of July 1, 1992.
Approved methods of recovery, recycling or reclaim­
ing must be followed. Fines and/or incarceration may
be levied for non-compliance.
See figure 1 for unit clearances.
RECOMMENDED SERVICE CLEARANCES IN (mm)
D
FIGURE 1
B
C
mm
in.
mm
in.
1829
36
914
60
1829
36
914
60
1829
36
914
60
914
1
25
1
914
36
914
36
power
to
unit
OFF
C
B
A
D
Top
Clearance
mm
in.
mm
1524
60
1524
1524
72
1829
1524
96
2438
Unobstructed
25
1
25
914
36
914
at

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sch036Sgh060Sch060Sgh120Sch120Sgh240 ... Show all

Table of Contents