Service Literature
The SSB*H4 is a high efficiency commercial split−system
condensing unit, which features a two stage scroll compres-
sor and R−410A refrigerant. SSB*H4 units are available in 3,
4and 5 ton capacities.. The series is designed for use with
an expansion valve (approved for use with R−410A) in the
indoor unit. This manual is divided into sections which dis-
cuss the major components, refrigerant system, charging
procedure, maintenance and operation sequence.
Information contained in this manual is intended for use by
qualified service technicians only. All specifications are sub-
ject to change.
WARNING
Improper installation, adjustment, alteration, service
or maintenance can cause property damage, person-
al injury or loss of life. Installation and service must
be performed by a qualified installer or service
agency.
WARNING
Warranty will be voided if covered equipment is re-
moved from original installation site. Warranty will
not cover damage or defect resulting from:
Flood, wind, lightning, or installation and operation
in a corrosive atmosphere (chlorine, fluorine, salt,
recycled waste water, urine, fertilizers, or other dam-
aging chemicals).
DANGER
Shock Hazard
Remove all power at disconnect
before removing access panel.
Single phase SSB*H4 units use
single-pole contactors. Potential
exists for electrical shock resulting
in injury or death.
Line voltage exist at all components
(even when unit is not in operation).
Corp. 0628−L5
Revised 02−2007
SSB*H4 Commercial Air Conditioner
Page 1
IMPORTANT
Operating pressures of this R−410A unit are higher
than pressures in R−22 units. Always use service
equipment rated for R410A.
TABLE OF CONTENTS
General
. . . . . . . . . . . . . . . . . . . . . . . . . . .
Specifications / Electrical Data
I Application
. . . . . . . . . . . . . . . . . . . . . . . .
II Unit Components
. . . . . . . . . . . . . . . . . .
III Refrigeration System
. . . . . . . . . . . . . .
IV Charging
. . . . . . . . . . . . . . . . . . . . . . . .
V Service and Recovery
VI Maintenance
. . . . . . . . . . . . . . . . . . . . .
VII Wiring and Sequence of Operation
SSB*H4
Page 1
. . . . . . . .
Page 2
Page 4
Page 4
Page 12
Page 13
. . . . . . . . . . . . .
Page 17
Page 17
.
Page 18
©2006 Lennox Industries Inc.