•
IP address information configuration
•
Stack configuration
Installation Preparation
This task flow shows the sequence of procedures you perform to prepare for ERS 5000
installation.
Installation Preparation Task Flow
Navigation:
•
Installation preparation
•
Verifying environment suitability
•
Verifying the package contents
Switch placement
This task flow shows the sequence of procedures you perform to place the switch.
Installing Avaya Ethernet Routing Switch 5000 Series
on page 37
on page 39
on page 43
on page 43
on page 45
Installation Preparation
December 2013
33