Indoor Unit Test; Outdoor Unit Test - Danby DAS120EAQHWDB Owner's Manual

Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION INSTRUCTIONS
INSTALLATION - FINAL STAGE
1. Wind insulation covering around the joints of
the indoor unit and secure it with tape.
2. Secure the extra length of signal cable to the
piping or to the indoor unit.
3. Secure the piping to the wall with clamps.
4. Seal the hole in the wall through which the
piping is passed so that no air or water can pass
through.

INDOOR UNIT TEST

• Does the unit turn on and off normally?
• Does the fan operate normally?
• Do the set point and timer operate properly?
• Does each light turn on normally?
• Does the louver operate normally?
• Is the condensed water draining?
Clamps
insulating covering
piping
(indoor)

OUTDOOR UNIT TEST

• Is there any abnormal noise or vibration during
operation?
• Could the noise, the air fl ow or the condensed
water drainage disturb the neighbours?
• Is there any coolant leaking?
Note: the electronic controller allows the compressor
to start only three minutes after voltage has reached
the system.
11
insulating tape
piping
gasket
(outdoor)
wall

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Das180eaqhwdb

Table of Contents