Packing List; Additional Items Required; Recommended Installation Procedure; Optional Equipment Installation - Lopi ProBuilder 36 CleanFace GSB2 Installation Manual

Hide thumbs Also See for ProBuilder 36 CleanFace GSB2:
Table of Contents

Advertisement

Packing List

LP (Propane) Conversion Kit:
Rear Burner Orifice (#57), Front Burner Orifice (#63), Pilot Orifice (0.14 LP), LP Regulator
Thimble (2-Piece
Assembly)
Pipe Shield
Header Shield
Includes a log set.
Wall Switch, Cover Plate, and Wire.

Additional Items Required

Gas Line Equipment (shutoff valve, pipe, etc.)
Electrical Equipment (min. 14 gauge, grounded line)

Recommended Installation Procedure

Frame the opening for the fireplace. Make sure to allow for vent installation.
Install the vent, gas line and electrical hook-up.
Install the drywall.
Install the hearth (if applicable).
Install the facing (if applicable).
Install the mantel (if applicable).
Finalize the installation (see page 36).

Optional Equipment Installation

If using Propane, convert the appliance.
Install fireplace.
If using optional firebacks, install them.
Install logs, ember chunks, and rockwool.
© Travis Industries
Installation
(for qualified installers only)
11/9/20 - 1503
7
PB36 CF Install (Aust)

Advertisement

Table of Contents
loading

Table of Contents