2.7 PEU (with integrated DCU)

The PEU has an integrated DCU. It is supplied loose for customer fitment.
Fig 2.2 - PEU Dimensions and Clearance requirements.
The PEU is an emissions related component and must be Perkins supplied.
The PEU must be mounted vertically +/-5° with the two DEF connections at the bottom and
the filter at the top to ensure injection and purge functionality
The PEU must be mounted internally or externally via all four M8 mounting through holes
ref section 5.5.1
The mounting face between the four points must be flat within a tolerance of +/- 0.5mm
The maximum tilt during operation is 45°
The PEU must be mounted so that the vibration falls within the specified limits in section
4.4.2
The PEU must not be engine mounted. It is recommended that the pump is mounted on
the machine chassis
The PEU must be mounted in a location:
that is protected from splash, stone chips, dirt and debris
Care should be taken to ensure dust and debris does not build up on the box
o
and does not block the vent on the rear of the unit.
Measures should be taken to prevent dust/debris falling into the filter chamber
o
when removed for service
where the pump temperature limits are not exceeded- ref section 4.3.1
In order to achieve this, the pump should not be mounted near any heat source
o
and there must be sufficient cool airflow round the pump.
The following clearances are required for servicing:
A&I manual Publication TPD 1832 – Production issue 3.
1204F - DEF System Supplement
Page 10 of 41

Advertisement

Table of Contents
loading

This manual is also suitable for:

1204f-e44ta1204f-e44tta

Table of Contents