Instructions For Pipe Mounting - YOKOGAWA BA11 Instruction Manual

Active junction box
Table of Contents

Advertisement

9
With NEMA 4X bracket
Without NEMA 4X bracket
3.23
14.5
Figure 5. Bracket mounting
2

3-2-2. Instructions for pipe mounting

Dimension in
3.31
mm [inches]
Figure 6. Pipe mounting
Refer to 3-2-1 for bracket mounting. Fasten the assembled BA11 together with the
bracket on the pipe using M8 U-bolt, 2x M8 washers and two M8 nuts delivered
with /UM mounting set.
IM 12B06W03-01E-E

Advertisement

Table of Contents
loading

Table of Contents