3. Preparation 3-1. Installation 3-2. Mounting options for BA11 Active Junction Box 3-2-1. I nstructions for mounting BA11 on the mounting bracket, with or without using the NEMA 4X bracket 3-2-2. Instructions for pipe mounting 3-2-3. Instructions for wall mounting 3-2-4.
Model Code and Serial Number on the particular purpose but rather to describe the BA11 (see figure 1) are the same as on functional details of the product. the packing list. Also check if option(s) that were ordered are included and correct.
2017 2030 of the product is strictly prohibited because 2018 2031 it may be hazardous to operate. Please 2019 2032 contact Yokogawa before making any repair 2020 2033 or modification. 2021 2034 2022 2035 The following safety symbols are used on...
Product Disposal The instrument should be disposed of in accordance with local and national legislation/regulations. • The BA11 should only be used with equipment that meets the relevant EU, 1-5. Warning and Disclaimer American, Canadian, and Japanese The product is provided on an “as is” basis.
Modbus slave device is disconnected. The BA11 box detects if a Modbus slave device is connected to the port (J1..J4). If not, the communication terminator is connected. If a Modbus slave is connected to a port (J1..J4), the terminator is disconnected automatically.
2-2. Regulatory standards By applying: • CE (768/2008/EC) - EN-ISO 9001: 2008. By applying: EMC Directive (2014/30/EU) - IEC 61326-1:2012 Electrical equipment for measurement, control and laboratory use – EMC requirements – Part 1: General requirements. Emission: Class B, control and laboratory use. Immunity: For use in industrial locations.
Page 8
FM19CA0089X. For Specific conditions of Use refer to section 1-4. Certificate no.: - AS/NZS CISPR 11 • Compliancy - KC Registration of broadcasting and communication equipment KCC-R-R-YPA-BA11 • Recommendations and guidelines NAMUR Precompliance checked by applying: - NAMUR NE21: 2017 Electromagnetic compatibility (EMC) of industrial process and laboratory.
D&E 2019-012-A60 3-2. Mounting options for BA11 Active Junction Box The BA11 Active Junction Box can be mounted on a wall, pipe or backside of FLXA402 analyzer. Mounting materials can be ordered as option (/UM) or as spare part (K1548PM).
3.31 mm [inches] Figure 6. Pipe mounting Refer to 3-2-1 for bracket mounting. Fasten the assembled BA11 together with the bracket on the pipe using M8 U-bolt, 2x M8 washers and two M8 nuts delivered with /UM mounting set. IM 12B06W03-01E-E...
8x50 anchors and 6.3x50 screws delivered with /UM mounting set. Note: The wall on which BA11 is mounted should be strong enough to bear the weight of more than 8 kg (17.64 pound).
Non Incendive for FM-US / FM-Canada Connection type M9 male/female connectors, 5 pins Options Universal mounting set 5. Spare parts Spare part Description K1548DC One set of dust- and protection caps K1548PM /UM universal mounting set for BA11 IM 12B06W03-01E-E...
Page 16
Yokogawa has an extensive sales and YOKOGAWA ELECTRIC ASIA Pte. LTD. YOKOGAWA ELECTRIC CORPORATION World Headquarters 5 Bedok South Road distribution network. Singapore 469270 9-32, Nakacho 2-chome, Musashino-shi Tokyo 180-8750 Singapore Please refer to the European website www.yokogawa.com/sg Japan www.yokogawa.com (www.yokogawa.com/eu) to contact your...