Konica Minolta REGIUS 110 HQ Installation Manual page 33

Direct digitizer
Hide thumbs Also See for REGIUS 110 HQ:
Table of Contents

Advertisement

Back of the first front side
Back of
the second
front side
This is the final step in the process of changing the installation position of the operation panel.
Proceed to
"2.5 Moving to and Fixing at Installation Location"
installation location
2.4 Changing Operation Panel Installation Position
17
Install the first front back panel.
Seven screws (M4 × 8)
Hold the bottom of the first front back panel with both
hands and push the top of the panel into the top panel.
18
Install the second front back panel.
Six screws (M4 × 8)
Four spacers
to move the machine and fix it at the
2-21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

0404

Table of Contents