Trane Thermo King V-520 RT SPECTRUM 50 Installation Manual page 3

Multi-temperature systems truck edition
Table of Contents

Advertisement

Release History
Released
(07/12)
Rev. 1
(06/12) Pages 8, 10, 20 and 56: added silicone sealant update, page 39; increased compressor oil quantity.
Rev. 2
(09/13) Page 5: changed compressor oil from 203-513 to 203-515.
Rev. 3
(12/13) Pages 8, 13 and 14: changed text and art to clarify the minimum distance required from the cargo wall to the
rear of the evaporator with or without heat option.
Rev. 4
(04/14) Pages 24, 26 and 28: added torque of 60 in-lbs for plastic cover screws.
Rev. 5
(08/14) Pages 9, 20, 21, 54 and 55: Added compressor ground wire.
Rev. 6
(11/15) General update to manual including adding SPR and CPR adjustment procedures, system leak check and
evacuation procedures, updated information on battery connections and how to properly secure maxi fuse holder.
Rev. 7
(01/16) Added new in-line fuse installation procedures.
V-520 RT Installation Manual
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thermo king es300

Table of Contents