Commissioning

Commissioning should be done only by quali ed personnel (Toshiba and Distributors).
6.1

Installation and functional check

Make sure that all electrical connections are in order before you take your Redundancy box in operation:
Visual inspection of connections
Control of the system for damage and pollution
Open locking device
6.2

Switching on the Redundancy box

When all installation inspections were successfully carried out, switch on the supply voltage and measure
them. The supply voltage should be 230 VAC.
Only after that close the locking device and the unit is ready for operation.
After switching on, the control goes through internal functions. After a successful start, the splash screen
appears on the display for a few seconds. The control program of the Redundancy box is now in operati-
on.