Rinnai RHEPM8020N Modulating Supplemental Manual page 27

High-efficiency (he+) series infrared gas heater

Advertisement

12. START-UP / COMMISSIONING SHEET
THIS EQUIPMENT HAS BEEN FACTORY FIRED AND TESTED PRIOR TO SHIPMENT. HOW-
EVER, THIS APPLIANCE IS NOT "PLUG & PLAY". IT REQUIRES COMMISSIONING AND
FIELD ADJUSTMENT / SPECIFICATIONS CONFIRMATION TO ENSURE SAFE AND EFFI-
CIENT OPERATION.
AS PER I&O MANUAL AND LOCAL CODES
CONTRACTOR NAME: ................................................................................DATE................................
ADDRESS:............................................................................................................................................
............................................................................................................................................................
CITY:........................................................................................
PHONE:...................................................................................
CELL: .....................................................................................
JOB SITE......................................................................................................CITY................................
HEATER MODEL NUMBER:............................................................................................................
Located on burner rating plate
HEATER SERIAL NUMBER: ...........................................................................................................
Located on burner rating plate
TO ENSURE THAT SITE CONDITIONS ARE COMPATIBLE WITH THE HEATER'S PERFORMANCE, THE
FOLLOWING START-UP NEEDS TO BE COMPLETED BY THE QUALIFIED GAS INSTALLER.
THIS EQUIPMENT HAS BEEN FACTORY FIRED AND TESTED BEFORE DELIVERY, NEVERTHELESS
WARNING
IT IS NOT A PLUG IN APPLIANCE..IT DOES REQUIRE COMMISSIONING AND FIELD ADJUSTMENTS
During start up, material coatings used in the production process of tubes and reflectors will
"burn off" and create smoke during the first hour of operation. This is temporary and normal.
Please ensure that there is sufficient ventilation to adequately clear the smoke from the space.
Notify site and safety personnel to ensure that alarm systems are not unduly activated.
TO ENSURE THAT SITE CONDITIONS ARE COMPATIBLE WITH THIS HEATER, AND TO
ALLEVIATE NUISANCE CALL BACKS FOR THE CONTRACTOR, THE FOLLOWING
START-UP NEEDS TO BE COMPLETED BY THE LICENSED GAS INSTALLER.
A CONTRACTOR IS CALLING FOR TECHNICAL SUPPORT,
MUST PROVIDE THE FOLLOWING INFORMATION
FROM HIS COMPLETED COMMISSIONING REPORT ON NEXT PAGE
COMMISSIONING REPORT
START UP 'SMOKE'
27
HE+ Series Modulating Supplemental Manual