CONTROLS
11. Secure the lift link assembly to the lower end of the
HOC handle (Fig. 267).
4
12. Pump high temp grease into the HOC handle pivot
hub (Fig. 268).
13. Raise the deck and remove the boards.
4-24
Fig. 267
DSCN-3841a
Fig. 268
DSCN-3915a
Choke Cable Replacement
Choke Cable Removal
1. Remove the bolt and cable clamp securing the
choke cable to the engine throttle plate (Fig. 269).
Fig. 269
2. Remove the "Z" bend of the choke cable from the
engine choke arm (Fig. 270).
Fig. 270
36" & 40" Toro GrandStand Service Manual
DSCN-3505a
DSCN-3509a