Download Print this page

Installation Checklist - Slant/Fin CHS Series Installation And Operating Instructions Manual

Common venting

Advertisement

CHS Series
6.0 CHECKLIST

Installation Checklist

 1. Read and understand this manual and the Installation and Operation Instructions provided with the
Slant/Fin CHS 300-399 Boilers (CHS – 40).
installation of the boilers, CHS 300-399 Common Venting, vent and termination.
 2. Preform the Installation Checklist from the boiler Installation and Operation Instructions.
 3. Confirm that only Centrotherm – InnoFlue Polypropylene parts are used for the installation of this
CHS 300-399 Common Venting as outlined in Section 2.0 of this manual.
 4. When wall mounting, confirm the boilers are exactly 5" apart from each other in accordance with Section
3.0 of this manual.
 5. Install the CHS 300-399 Common Venting in the order outlined in Section 4.0 of this manual.
 6. Connector Rings are installed on every connection in accordance with Section 2.0 of this manual.
 7. Support Clamps are installed on the Exhaust and Air-inlet piping every 75" on vertical runs and every 40"
on horizontal runs in accordance with Section 2.0 of this manual.
 8. Centrocerin lubricant was applied to each gasket and male end of every venting connection.
 9. Termination of the Exhaust and Combustion Air-Inlet are in accordance with Section 5.0 of this manual.
 10. Advise home/building owner of their responsibilities with respect to maintaining the boilers and CHS
300-399 Common Venting.
Building owner is responsible for keeping the Exhaust Vent and Air-Inlet termination
free of snow, ice, or other potential blockages and for scheduling boiler routine
maintenance as described in the boiler installation instructions. Failure to properly
maintain the boiler and CHS 300-399 Common Venting may result in serious injury or death.
Operational Checklist
 1. For each boiler perform the Operational Checklist in the boiler installation manual.
 2. Ensure the CHS 300-399 Common Venting is free of combustion leaks.
 3. Confirm that each boiler ignites and operates smoothly (no delayed ignition and no pulsation).
 4. Flue gas combustion readings are measured on each boiler and are within the tolerances indicated in the
boiler installation instructions.
 5. Condensate lines are properly secured, free of leaks and drain freely.
 6. Ensure that each Non-Return Valve closes when the respective boiler is off.
 7. Products of combustion are not detected at the flue outlet of inoperable boilers, while other boilers are
running.
Before Leaving
 1. Allow each boiler to complete at least one heating cycle or to operate for at least 15 minutes. At this
point re-check the CHS Common Venting system for combustion gas and condensate leaks.
 2. Ensure the condensate traps are properly disposing the condensate in the appropriate location in
accordance with Section 6.0 in the boiler installation instructions.
Instructions to Installing Contractor
 1. Leave the manual with the customer so they know when to call for annual maintenance and inspection.
CHS 300-399 Common Venting
Understand the dangers associated with improper
Slant Fin Corp.
21

Advertisement

loading

This manual is also suitable for:

Chs 399818 192818 193