☐ Verify that the installation location of the unit will
provide the required clearance for proper
operation.
☐ Assemble and install the roof curb (if applicable).
Refer to the latest edition of the curb installers
guide that ships with each curb kit.
☐ Fabricate and install ductwork; secure ductwork to
curb.
☐ Rigging the unit.
☐ Set the unit onto the curb; check for levelness.
☐ Ensure unit-to-curb seal is tight and without buckles
or cracks.
☐ Install and connect a condensate drain line to the
evaporator drain connection.
Main Electrical Power Requirements
☐ Verify that the power supply complies with the unit
nameplate specifications.
☐ Inspect all control panel components; tighten any
loose connections.
☐ Connect properly sized and protected power supply
wiring to a field-supplied/ installed disconnect
switch and to the main power terminal block in the
unit control panel.
☐ Install proper grounding wires to an earth ground.
N N o o t t e e : : All field-installed wiring must comply with NEC
and applicable local codes.

External Vent Hood Installation

W W A A R R N N I I N N G G
H H a a z z a a r r d d o o u u s s V V o o l l t t a a g g e e ! !
F F a a i i l l u u r r e e t t o o d d i i s s c c o o n n n n e e c c t t p p o o w w e e r r b b e e f f o o r r e e s s e e r r v v i i c c i i n n g g c c o o u u l l d d
r r e e s s u u l l t t i i n n d d e e a a t t h h o o r r s s e e r r i i o o u u s s i i n n j j u u r r y y . .
D D i i s s c c o o n n n n e e c c t t a a l l l l e e l l e e c c t t r r i i c c p p o o w w e e r r , , i i n n c c l l u u d d i i n n g g r r e e m m o o t t e e
d d i i s s c c o o n n n n e e c c t t s s b b e e f f o o r r e e s s e e r r v v i i c c i i n n g g . . F F o o l l l l o o w w p p r r o o p p e e r r
l l o o c c k k o o u u t t / / t t a a g g o o u u t t p p r r o o c c e e d d u u r r e e s s t t o o e e n n s s u u r r e e t t h h e e p p o o w w e e r r
c c a a n n n n o o t t b b e e i i n n a a d d v v e e r r t t e e n n t t l l y y e e n n e e r r g g i i z z e e d d . . V V e e r r i i f f y y t t h h a a t t n n o o
p p o o w w e e r r i i s s p p r r e e s s e e n n t t w w i i t t h h a a v v o o l l t t m m e e t t e e r r . .
1. Remove and discard the cover plate located on the
gas heat panel.
I I m m p p o o r r t t a a n n t t : :
Make sure you read the label
located on the cover plate before
you discard it.
Do not discard the fastening screws!
They will be needed to install the
vent hood.
16
Figure 10. Discard cover plate
2. Locate the vent hood behind the panel, along the
base of the unit.
3. Install the vent hood on the gas heat panel using
the screws removed in Step 1. Make sure it is
properly secured to the panel.
Figure 11. Vent hood installation
Condensate Drain Configuration
An evaporator condensate drain connection is
provided on each unit. Refer to
for the appropriate drain location.
N N o o t t e e : : Use 1-inch PVC pipe to connect to the drain pan
outlet provided in the unit. This is a slip fit joint
(no threads) and can be sealed using PVC