Cisco HyperSwitch A100 User Manual page 96

Table of Contents

Advertisement

Step
Step
Communications
Setting
To
set
terminal
Line transmission
Data
Parity
Stop
Flow
After
Verifying
Operation
To
verify operation
Step
Step
Moving Equipment
This section
Step
Step
Step
Step
Step
Step
Step
Step
Step
After
completes
11
installation
The Boot program
loads software
DRAM
and
memory
activates
test
Remove
12
the Ethernet
cable
Parameters
Software
new
data
configuration
specify
9600
rate
bps
bits
none
bit
bit
ON
control
Software
Upgrading
the following
perform
new
data
If
configuration
A100
The HyperSwitch
will
the console
terminal
Using
A100
free
HyperSwitch
is
describes the procedure
new
Ensure
the
installation
environmental
conditions
terminal
the console
is
If
and
switch
terminal
power
EIA/TIA-232
Remove
the
switch
on
Set
the
power
the
cable
Unplug
power
Remove
cable
all optical
their
cables
with
respective
A100
Move
the
HyperSwitch
Reconnect
the
cables
optical
cable
the correct
to
optical
EIAITIA-232
the
Reconnect
the console
terminal
Plug
ON
Turn
the console
terminal
the Reset
button
on
press
from
the Flash
memory
A100
The HyperSwitch
it
A100
from
the
HyperSwitch
communications
the following
procedure
was entered
the Reset
press
execute
self-diagnostic
confirm
the software
that
of errors
HyperSwitchAl00
moving
the
for
the
HyperSwitch
site for
described
in chapter
Installing
connected
the
HyperSwitch
to
the console
terminal
unplug
from
cable
the
HyperSwitch
back
the
of the
HyperSwitch
from
and
the wall
outlet
power
from
connectors
the
HyperSwitch
numbers
slot
to
facilitate
and
the console
terminal
AlOO
the
to
HyperSwitch
number
slot
cable
the
to
HyperSwitch
cable
the wall
into
power
power
power switch
Maintaining
Moving
the
again
HyperSwitchAl0O
random-access
to
dynamic
then
executes
self-diagnostic
and
server workstation
the console
on
parameters
button
on
the
HyperSwitch
test
version
changed
and
the
that
Al00
the
meets
installation
A100
the
HyperSwitch
OFF
100
the console
turn
from
cable
the
power
power
A100
OFF
Al00
main
unit
the
to
from
the
then
HyperSwitch
A100
Mark
front
panel
later
reconnection
new
site
installation
the
to
Be
connect
to
front
panel
sure
A100
outlet
the
and
HyperSwitch
Upgrading
Equipment
A100
outlet
position
100
the
the
00
Al
3-23

Advertisement

Table of Contents
loading

Table of Contents