Cisco HyperSwitch A100 User Manual page 76

Table of Contents

Advertisement

Chassis
the
Replacing
Perform
Step
Step
Step
Step
Step
Step
Step
Communications
Setting
To
set
following
Step
Step
Step
Step
System
Setting
Configuration
Figure
corresponds
Step
Step
Step
Step
Cover
the following
replace the chassis
to
steps
25
millimeters or
Approximately
back
the cover
the screw
until
bottom
of the
HyperSwitch
on
Grasp
the card
ejectors
Al00
HyperSwitch
front
panel
Reconnect
the optical cables
Connect
the optical cable
AlO0
main
HyperSwitch
Connect
new
the
optical cable
EIAJTIA-232
Reconnect
the
A100
of the
HyperSwitch
the
cable
into
power
Plug
Software
Parameters
AlOO
and
the
HyperSwitch
procedure
Turn on
the console
terminal
communications
Set
the
parameters
Line
transmission
rate
Data
bits
none
Parity
bit
bit
Stop
ON
Flow
control
the
switch
the
on
Set
power
Al00
will
HyperSwitch
start to
no hardware
Confirm
that
for
slot
not indicated
is
Data
and
3-5
show
3-4
flowchart
Figure
in the following
the actions
to
show
Enter
interface
to
display
Confirm
number
the
that
line
does
not display
the
either
OFF
exists
Turn
the
HyperSwitch
enable
Enter
enter privileged
to
Enter the privileged
password
cover
from
inch
the front put the cover
and
holes align Reinsert
AlO0
PROC
the
and
card
panel
replace
Reinsert and
fasten the six outer
removed
earlier
new LINF
card
the
for
the
to
unit
such
the other device
to
EIAITIA-232
cable
to the
panel Connect
front
the other
outlet
the
power
communications
console
terminal
power switch
on
the console
terminal
9600
bps
back
of
the
HyperSwitch
execute
self-diagnostic
item indicates
configuration
LINF
on which
the
card
is
actually
for
system
setting
procedure
LINF
data
for cards
installed
LINF
of the
newly
installed
LINF
card
installed
is
improperly
A100
switch
power
command mode
The system
The prompt
from
changes
Maintaining
Adding
base Then
on
the
fasten the screws
on
the
rear
the card
the
into
screws
on
the
of the
slot
front
router
or terminal
equipment
as
Sb-i
connector
on
the
left
end
console
terminal
the
to
parameters perform
the
the following
to
ON
AiO0
The
the
to
position
test
NG
no
Not
and
good
that
Installed
installed
The
data
flowchart
configuration
in
the
HyperSwitch
the
If
line
card
displays
hardware
LINF
or
error
card
and check
the
password
requests
to
and
the HyperSwitch
Upgrading
LINF Card
slide
and
side
the
100
number
00
Al
3-3

Advertisement

Table of Contents
loading

Table of Contents