Clearances; Unit 4 Point Load; Unit 6 Point Load; Unit Center Of Gravity - York PREDATOR 120 Installation Manual

Single package air conditioners and single package electric units
Hide thumbs Also See for PREDATOR 120:
Table of Contents

Advertisement

Before lifting, make sure the unit weight is distrib-
uted equally on the rigging cables so it will lift evenly.
Units may be moved or lifted with a forklift. Slotted openings
in the base rails are provided for this purpose.
LENGTH OF FORKS MUST BE A MINIMUM OF 60
INCHES.
All panels must be secured in place when the unit is
lifted.
The condenser coils should be protected from rig-
ging cable damage with plywood or other suitable
material.
FIGURE 5 -

UNIT 4 POINT LOAD

TABLE 3: UNIT WEIGHTS
Model
Shipping Weight
DM090
1056
DM120
1121
DM150
1200
Econ.
85
w/ PE
150
2
49
Elec. Heat
*.
Weights include largest gas heat option.
†.
54kW heater.
12
*
(lb.)
Operating Weight
(lb.)
1051
1116
1195
84
148
49
TABLE 4: 6 POINT LOAD WEIGHT
Model
A
DM090
158
DM120
168
DM150
180
*.
Weights include largest gas heat option.
TABLE 5: 4 POINT LOAD WEIGHT
Model
A
DM090
230
DM120
245
DM150
262
*.
Weights include largest gas heat option.
FIGURE 6 -

UNIT 6 POINT LOAD

47 1/2"
LEFT
FIGURE 7 -

UNIT CENTER OF GRAVITY

CLEARANCES

All units require particular clearances for proper operation
and service. Installer must make provisions for adequate
ventilation air in accordance with applicable provisions of the
local building codes. Refer to Table 6 for clearances required
for combustible construction, servicing, and proper unit oper-
ation.
035-17311-002-A-0803
*
Location (lbs.)
B
C
D
E
142
128
187
207
151
136
198
219
161
145
212
235
*
Location (lbs.)
B
C
197
287
209
305
224
327
25 1/2"
FRONT
Unitary Products Group
F
230
244
262
D
336
357
382